top of page
Highfield R.F.C.
In May 2022, we carried out a re-development of the first pitch in Highfield .
All existing perimeter fencing was removed, new concrete footpaths and fencing as well as access and viewing areas were installed.
We installed pathways for pedestrian access and speed ramps for traffic calming and installed new vehicle and pedestrian access onto the playing pitch also.
For the pitch itself, we installed a full drainage system with primary and secondary drainage, new attenuation area as well as a pumped outlet.
New irrigation system was installed to service both playing pitches with surface improvements carried out to the main playing pitch also.
Highfield
Highfield
Highfield R.F.C.
Highfield
1/10
bottom of page