Completed in spring 2021 we installed a full secondary drainage system for Ballinora GAA on their 4,000m2 training pitch.

 

We installed gravel filled sand slits at 1 meter c/c to provide adequate drainage to the clay soils which tied into the existing primary drainage network.

 

All drainage lines were sand capped and the pitch overseeded to provide a suitable surface for year round training facilities.